Toilet Revamp Redesign

  • Job Ref.No: 01146293
  • Budget:
  • Timeline: to be confirmed later
  • Closing on: 14/03/2020
  • Country: Singapore

Part time Job Description



Toilet Revamp Essentials Package
(1) New Toilet Bowl
(2) New Basin
(3) Re-Design of Counter Top (Modern or industrial)
(4) Fabricate and Installation of New Counter Top
(5) Plumbing works

Entire Duration : 1 - 2 Days
SGD $ *** Nett


Toilet Revamp Basic Package
(1) Re-design of Toilet
(2) Feature wall - 180 sqft
(3) Tiles (Flooring) - 20 sqft

Entire Duration : 2 - 3 Days
SGD $ *** Nett



Toilet Revamp [ SHOW HAND ] Package

(1) Re-Design of Toilet
(2) New Toilet Bowl
(3) Fabricate + Installation of Ceramic/Quartz Counter Top
(4) New Basin
(5) Lighting Works
(6) 200 sqft Feature wall / Venetian Polish
(7) 20 sqft Premium Tiles Overlay
(8) Rain Shower feature with installation (Hot/Cold)
(9) Full Plumbing works

Entire Duration : 2 - 3 Days
SGD $ *** Nett (BTO) / SGD *** (Re-Sale Flat)



PM or Contact us today to find out more
Click on the below link to get in touch with us now

SMS / WHATSAPP / CALL : (65) 8332 *** Yue Xiang
www.freelancezone.com.sg/...ovation.html
SMS / WHATSAPP / CALL : (65) 8121 *** Esmond
www.freelancezone.com.sg/...ovation.html
Job Requirement
Professional Revamp Specialist with over 10 Years of Experience !

Please DO NOT provide your credit card details when applying for jobs.
Applicants are advised not to pay any upfront payment or any registration fee for the purpose of applying jobs.
This ad was registered on 13/02/2020 at https://www.freelancezone.com.sg/part-time-job/1023310150301146293/toilet-revamp-redesign.html. FreelanceZone.com.sg does not charge any fee or take any commission for finding and applying jobs.
Something suspicious? Report this job

1 Applicants
Received
Job Views
Received
140